A new boat ramp at Rhyll

The team at Adroit Concreting finally got to go boating this week. This time they never left the ramp – all week long. Concerting the boat ramp at Rhyll – Phillip Island the team completed the form work and poured the new boat ramp. Obvious challenges included both the tide and the volume of concrete need in a very short space of time. This has to be one of the most challenging jobs we have tackled.

There were all the normal challenges when pouring concrete plus the added complexity of tides times.